Building information modelling (BIM) imp... [paper 2012/5]
 
   
       
 

ITcon Vol. 17, Special Issue Management of remote construction sites and the role of IT Systems , pg. 75-92, http://www.itcon.org/2012/5

Building information modelling (BIM) implementation and remote construction projects: Issues, Challenges and Critiques

SUBMITTED:
REVISED:
PUBLISHED: May 2012
EDITOR: Egbu C., Sidawi B.

Yusuf Arayici
The School of the Built Environment, The College of Science and Technology,
The University of Salford, Greater Manchester, UK y.arayici@salford.ac.uk

Charles Egbu
The School of the Built Environment, The College of Science and Technology,
The University of Salford, Greater Manchester, UK c.o.egbu@salford.ac.uk

Paul Coates
The School of the Built Environment, The College of Science and Technology,
The University of Salford, Greater Manchester, UK s.p.coates@edu.salford.ac.uk

SUMMARY:The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique and even more complicated challenging problems in relation to communication and management due to the remoteness of the construction sites. On the other hand, Building Informational Modelling (BIM) is offered by some as the panacea to addressing the interdisciplinary inefficiencies in construction projects. Although in many cases the adoption of BIM has numerous potential benefits, it also raises interesting challenges with regards to how BIM integrates the business processes of individual practices. This paper aims to show how BIM adoption for an architectural company helps to mitigate the management and communication problems in remote construction project. The paper adopts a case study methodology, which is a UK Knowledge Transfer Partnership (KTP) project of BIM adoption between the University of Salford, UK and John McCall Architects (JMA), in which the BIM use between the architectural company and the main contractor for a remote construction project is elaborated and justified. Research showed that the key management and communication problems such as poor quality of construction works, unavailability of materials, and ineffective planning and scheduling can largely be mitigated by adopting BIM at the design stage.

KEYWORDS: Building Information Modelling, Communication, Remote Construction Projects

FULL TEXT: file.pdf (1,562,249 bytes)

CITATION:

Yusuf Arayici, Charles Egbu, Paul Coates (2012) Building information modelling (BIM) implementation and remote construction projects: Issues, Challenges and Critiques, ITcon Vol. 17, Special Issue Management of remote construction sites and the role of IT Systems , pg. 75-92, http://www.itcon.org/2012/5

 

 
Journal is partially sponsored by logo ARRS
Slovenian Research Agency

CIB logo
Editor-in-chief:
Robert Amor

ISSN 1874-4753
 

Member of OASPA

   
 
view how record was changing over time HOME LOGIN (you are user _anon_172684 from group guest) Powered by SciX Open Publishing Services 1.002