contents  
Problems and barriers of ICT utilization... [paper 2012/6]
 
   
       
 

ITcon Vol. 17, Special Issue Management of remote construction sites and the role of IT Systems , pg. 93-102, http://www.itcon.org/2012/6

Problems and barriers of ICT utilization on Iranian construction sites: Case study on the successful use of ICT in remote construction sites

SUBMITTED: March 2011
REVISED:
PUBLISHED: May 2012
EDITOR: Egbu C., Sidawi B.

Ali Alaghbandrad, M.Sc. Student,
Department of Construction Engineering and Management, Science and Research Branch, Islamic Azad
University, Tehran, Iran
email: a.alaghbandrad @srbiau.ac.ir

Ehsan Asnaashari, PhD Candidate,
School of Architecture, Design and the Built Environment, Nottingham Trent university, Nottingham, UK
email: ehsan.asnaashari@ntu.ac.uk

Christopher Preece, Professor,
Department of Civil Engineering, Razak School of Engineering & Advanced Technology, Universiti
Teknologi Malaysia (UTM), International Campus, Jalan Semarak, Kuala Lumpur, Malaysia
email: chrispreece@ic.utm.my

SUMMARY:To clarify the current situation of ICT utilization in the Iranian construction industry, twelve semistructured interviews were conducted with highly-experienced construction practitioners and ICT developers in the Iranian construction industry from 2009 to 2010. Interviews were qualitatively analyzed and a narrative interpretation was developed. Results obtained during this survey included identifying the barriers for ICT utilization in the Iranian construction organizations. The problems and barriers were divided into three groups: barriers for ICT usage in construction sites, barriers for ICT usage in head offices and common barriers of ICT usage in construction sites and head offices. This paper will discuss the barriers for ICT usage in construction sites. Some of the interviewees mentioned their company advances in ICT application and overcoming the barriers and problems. This paper focuses on a case study of a successful construction firm in the ICT utilization and overcoming the barriers of ICT adoption on remote construction sites. A study on ICT application in construction projects of this company can draw a pattern for other similar construction firms in Iran and.

KEYWORDS: case study, construction project, ICT barriers, ICT utilization, Iran

FULL TEXT: file.pdf (302,103 bytes)

CITATION:

Ali Alaghbandrad, Ehsan Asnaashari, Christopher Preece (2012) Problems and barriers of ICT utilization on Iranian construction sites: Case study on the successful use of ICT in remote construction sites, ITcon Vol. 17, Special Issue Management of remote construction sites and the role of IT Systems , pg. 93-102, http://www.itcon.org/2012/6

 

 
Journal is partially sponsored by logo ARRS
Slovenian Research Agency

CIB logo
Editor-in-chief:
Robert Amor

ISSN 1874-4753
 

Member of OASPA

   
 
view how record was changing over time HOME LOGIN (you are user _anon_485664 from group guest) Powered by SciX Open Publishing Services 1.002