Journal of Information Technology in Construction
ITcon Vol. 31, pg. 1454-1483, http://www.itcon.org/2026/59
Bridging the standardisation gap: A lifecycle framework for auto-ID IoT integration with BIM in post-disaster reconstruction
| DOI: | 10.36680/j.itcon.2026.059 | |
| submitted: | July 2026 | |
| published: | November 2026 | |
| editor(s): | Rahimian F | |
| authors: | Sepehr Abrishami, Dr
Faculty of Technology, University of Portsmouth, UK https://orcid.org/0000-0003-4692-1721 sepehr.abrishami@port.ac.uk Yunus Tak, Mr Faculty of Technology, University of Portsmouth, UK https://orcid.org/0009-0009-5059-0719 yunus.tak@port.ac.uk Reyhaneh Shojaei, Dr Faculty of Technology, University of Portsmouth, UK https://orcid.org/0000-0003-1897-8245 Reyhaneh.Shojaei@port.ac.uk Evelyn Kanso, Miss Faculty of Technology, University of Portsmouth, UK https://orcid.org/0009-0005-7792-7482 Evelyn.Kanso@myport.ac.uk | |
| summary: | Post-disaster reconstruction places extreme demands on information management. Supply chains fracture, coordination breaks down, and the component data needed to move from temporary housing to permanent rebuilding is rarely retained. Building Information Modelling (BIM) and Internet of Things (IoT) technologies together offer a route to that continuity, yet construction-oriented guidance for staging automatic identification (Auto-ID) device deployment within BIM information management remains absent, and deployments stay fragmented. This study develops a baseline framework for that setting. Its scope is the Auto-ID class of IoT edge devices, principally radio-frequency identification (RFID) and near-field communication (NFC) transponders acting as data carriers, and it excludes environmental and structural sensing. Adopting a Design Science Research (DSR) paradigm, the research proceeds in two empirical stages. Stage 1 is a requirement analysis drawn from a precursor questionnaire of 110 registered architects working on post-disaster housing, which establishes the operational baseline. Stage 2 is an evaluation survey completed by 113 architecture, engineering and construction (AEC) professionals, which assesses the resulting framework. The result is a five-phase technical guideline covering initial engagement, application selection, interoperability, stakeholder alignment and security assurance, with security treated as a gate repeated at each phase. These micro-scale phases are mapped onto the macro-scale disaster management cycle to give an integrated lifecycle model. The study also proposes the Data-to-Design Handover, a mechanism that carries component integrity data from temporary housing units into generative design for permanent reconstruction. Respondents rated all five phases as important in aggregate, with stakeholder alignment rated highest and interoperability lowest, and 68.1% reported that referenceable guidelines would raise their likelihood of adopting Auto-ID solutions. The evaluation is descriptive and perception based. The handover mechanism and the progression towards a mature predictive digital twin are conceptual propositions that were not tested, and the framework awaits implementation in live projects. | |
| keywords: | building information modelling (BIM), internet of things (IoT), auto-ID, digital twin, post-disaster reconstruction | |
| full text: | (PDF file, 1.376 MB) | |
| citation: | Abrishami, S., Tak, Y., Shojaei, R., & Kanso, E. (2026). Bridging the standardisation gap: A lifecycle framework for auto-ID IoT integration with BIM in post-disaster reconstruction. Journal of Information Technology in Construction (ITcon), Special issue Digital Twins for Smart and Sustainable Built Environments: Perspectives from SASBE 2025, 31, 1454-1483. https://doi.org/10.36680/j.itcon.2026.059 | |
| statistics: |



